Night-Time Road Repairs Partial Closure at Jalan Setia Raja Kuching from July 6-18

Night-Time Road Repairs: Partial Closure at Jalan Setia Raja Kuching from July 6-18

By Minul Islam Rony

Partial Road Closure at Jalan Setia Raja Kuching from July 6-18

Night-Time Road Repairs Partial Closure at Jalan Setia Raja Kuching from July 6-18
Night-Time Road Repairs Partial Closure at Jalan Setia Raja Kuching from July 6-18

Major Roadworks to Impact Traffic Flow in Kuching

Key Information on the Road Closure

KUCHING, July 7: The Public Works Department (JKR) Sarawak has announced a partial road closure at Jalan Setia Raja, specifically at the Muara Tabuan Roundabout, from July 6 to 18. This temporary closure is necessary to facilitate essential road repair works.

The closure will be enforced nightly from 8 PM to 5 AM to minimize disruption to daily traffic. JKR Sarawak has urged motorists to exercise caution when navigating the construction area and to adhere to all safety signs and instructions.

Details of the Road Closure

Duration and Timing

  • Start Date: July 6, 2024
  • End Date: July 18, 2024
  • Time: 8 PM to 5 AM daily

The night-time schedule is intended to reduce the impact on commuters and ensure the work can be completed efficiently and safely.

Advisory for Road Users

JKR Sarawak has issued a reminder for all road users to be vigilant when traveling through the affected area. The presence of construction equipment and workers necessitates a higher level of alertness to prevent accidents and ensure smooth traffic flow.

  • Safety Measures: Road users should follow the safety signs and any instructions from on-site personnel.
  • Alternate Routes: Motorists are encouraged to consider alternative routes where possible to avoid delays.

Importance of the Road Repair Works

Enhancing Road Safety and Quality

The resurfacing works are part of ongoing efforts to maintain and improve the infrastructure within Kuching. Well-maintained roads are crucial for ensuring safety, reducing vehicle wear and tear, and enhancing overall driving comfort.

  • Improved Road Conditions: Post-completion, the resurfaced roads will offer a smoother driving experience.
  • Long-term Benefits: The repairs are expected to extend the lifespan of Jalan Setia Raja, reducing the need for frequent repairs and minimizing future disruptions.

Public Response and Preparations

Local residents and frequent commuters on Jalan Setia Raja have been advised to plan their journeys in advance, considering the nightly closures. Businesses in the vicinity are also preparing for the potential impact on their operations, particularly those that rely on evening and early morning traffic.

Contact Information for Inquiries

For further details or inquiries regarding traffic flow and the roadworks, the public can contact JKR Kuching at the following number during office hours:

  • JKR Kuching Contact: 082-203400

Conclusion

The partial road closure at Jalan Setia Raja is a necessary inconvenience to facilitate critical road repairs. The Public Works Department (JKR) Sarawak is committed to ensuring the works are completed efficiently while minimizing disruption to the public. Road users are urged to stay informed, exercise caution, and plan their routes accordingly during this period.

By adhering to the provided safety measures and considering alternative routes, the community can help ensure that the roadworks proceed smoothly and on schedule.

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *